Product Details
Place of Origin: sichuan
Brand Name: Xidao
Certification: SAE J1772
Model Number: DC-60KW
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: negotiate
Packaging Details: Wooden case packaging
Delivery Time: 15-30 work days
Payment Terms: L/C, T/T
Supply Ability: 5000 per month
Product Name: |
60KW Car EV Charger |
Scram Button: |
The Whole Power Supply Can Be Cut Off In An Emergency |
Touch Screen: |
Man-machine Interface |
Charging Gun: |
A Gun/ B Gun |
Running Indicator Light: |
B Gun |
Power Indicator Light: |
The Supply |
IP Grade: |
IP 54 |
Adjustable Range Of Current Limiting: |
10%~110% Stepless Adjustable |
Product Name: |
60KW Car EV Charger |
Scram Button: |
The Whole Power Supply Can Be Cut Off In An Emergency |
Touch Screen: |
Man-machine Interface |
Charging Gun: |
A Gun/ B Gun |
Running Indicator Light: |
B Gun |
Power Indicator Light: |
The Supply |
IP Grade: |
IP 54 |
Adjustable Range Of Current Limiting: |
10%~110% Stepless Adjustable |
Commercial Car EV Charger 60KW DC EV Charging Station Touch Screen SAE J1772
Product Features
1. High efficiency: the efficiency is as high as 94%, which can save users' electricity consumption and reduce heat loss
2. High power density: small size, save space, adapt to the development direction of future chargers
3. Input high pressure shock resistance: greatly improve the reliability of the system.
4. Modular design: Multiple modules work in parallel, with strong fault tolerance. The failure of one module does not affect the use of the whole machine, and it is convenient to maintain and replace a single module.
5. Four charging in one machine: There are four DC charging interfaces. Under the control of the charging process, the DC output is automatically switched and has the function of power distribution.
Product Parameters
Product name | Car EV Charger | ||
Input voltage | AC 380V ±10% | ||
AC power input connection | 3P+N+PE | ||
Operating Frequency | 50hz | ||
Power Factor | >0.99 | ||
Output rated power | 60A | ||
Output Current | 0-360 | ||
Current limit adjustable range | 10%~100% | ||
Current error | ≤1% | ||
Current accuracy | ≤±1% | ||
Module Unbalance | ≤5% | ||
Ripple coefficient | ≤±5% | ||
Charge gun cable length | 2 guns/guns 7m cable | ||
Auxiliary power supply | 12V/24V | ||
Display method | Touch screen | ||
Protection level | IP54 | ||
Cooling method | Forced air cooling | ||
mounting method | Floor mounting | ||
Reference size | 800*1050*2000 |
product description
This EV DC fast charging pile adopts high frequency switching rectifier module, adjustable DC output voltage, DSP digital control, resonant soft switching, and active PFC technology. 50-500V wide output voltage range, and 12V and 24V auxiliary power adaption.
Details Images
In the future, we will continue to focus on the application of new energy technology, operate with integrity and work hard to create a green world.
FAQ
Q: How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC char- ging posts usually need to be customized according to the customer's technical parameters.
Q: How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days.
For DC charging post, the prototype time is usually 15 days.
For high power fast charging station, the technical parameters need to be
determined before production, and the prototype time is usually 30 days.
Q: How to guarantee the service?
Our products are divided into two categories: household and commercial.
For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial
For commercial chargers, we not only provide standardized services for charging piles, but also provide payment software docking services for opera
ting companies.
Q: How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are
in progress.